Having an issue with a high water table?


Having an issue with a high water table?


Our customer came to us with several sites on an island in Michigan. They've been having trouble with these locations due to the high water table. Pouring concrete was not an option because of the extensive de-watering process that would be required. They were finally able to move forward with these sites using our foundation system, completing 6 sites in 2.5 days.


Move forward with the Helicore System™